Manufacturing·Speculative
X-330 Process Building
Estimated MW
26.6
Score
69
Nearest sub.
69 kV
725.0 mi away
Signal profile
- Power60% of score10026.6 MW est.Footprint × archetype W/m²
- Grid proximity25% of score10725.0 mi to substationHIFLD / SeerAI substations 2025
- Voltage class15% of score4069 kV nearestHIFLD transmission
- Footprint9832.8 acresOSM building footprint
- Underutilization35Estimate onlyTX WARN layoff notices
- Data confidence80100% fieldsField coverage
Axes marked “% of score” are the weighted components of the headline composite (69). The rest are corroborating context.
Location
Coordinates
39.01696, -83.00067
Archetype
Manufacturing
Confidence tier
Speculative
Estimated load
26.6 MW