- Power60% of score10022.6 MW est.Footprint × archetype W/m²
- Grid proximity25% of score880.7 mi to substationHIFLD / SeerAI substations 2025
- Voltage class15% of score70138 kV nearestHIFLD transmission
- Footprint100139.5 acresOSM building footprint
- Underutilization82WARN-corroboratedTX WARN layoff notices
- Data confidence100100% fields · enrichedField coverage
Axes marked “% of score” are the weighted components of the headline composite (92). The rest are corroborating context.
Intelligence
The Corporate Ridge site is a strong candidate for a small data center or container-BESS deployment due to its underutilized industrial capacity and proximity to a high-voltage substation. However, the key risk lies in verifying the actual underutilization of the site. Further site assessment is necessary to confirm its potential.
The Corporate Ridge facility is a warehouse and logistics center with an estimated load of 22.58 MW, suggesting a significant amount of underutilized power. Given its proximity to a 138 kV substation, just 0.67 miles away, it has the potential to support a container-BESS or edge data center deployment, leveraging existing grid interconnection for efficient energy storage and distribution. The site's probable tier status and underutilization corroboration count of 1 indicate a potential opportunity, but the key risk of verifying actual underutilization must be addressed through further assessment.
Likely contacts
- Operator
- Champion Partners
- Phone
- 972-961-8534
Contacts are model-researched from public web sources and shown only when a source is attached. Verify before outreach.
Underutilization signals
- Interceramic Corporate Office and Distribution Center · Carrollton, Dallas County, TX118 layoffs · 2023-03-31T00:00:00.000