← All sites
Aerial view of Amarillo Road Company
Warehouse / Logistics·Speculative

Amarillo Road Company

1846 State Highway 207 Floydada

Estimated MW
27.9
 
Score
95
 
Nearest sub.
345 kV
1.2 mi away

Signal profile

Power100Grid proximity81Voltage class100Footprint100Underutilization35Data confidence100
  • Power60% of score100
    27.9 MW est.Footprint × archetype W/m²
  • Grid proximity25% of score81
    1.2 mi to substationHIFLD / SeerAI substations 2025
  • Voltage class15% of score100
    345 kV nearestHIFLD transmission
  • Footprint100
    172.2 acresOSM building footprint
  • Underutilization35
    Estimate onlyTX WARN layoff notices
  • Data confidence100
    100% fields · enrichedField coverage

Axes marked “% of score” are the weighted components of the headline composite (95). The rest are corroborating context.

Intelligence

The Amarillo Road Company site is a strong candidate for a small data center or container-BESS deployment due to its proximity to a high-voltage substation and underutilized industrial space. However, the key risk lies in the speculative nature of the site and lack of corroboration for underutilization. This uncertainty may impact the feasibility of the project.

The Amarillo Road Company is a logistics warehouse with an estimated load of 27.879 MW, suggesting a significant amount of underutilized power capacity. Given its proximity to a 345 kV substation, just 1.21 miles away, the site is well-positioned for a container-BESS or edge data center deployment, which could capitalize on existing grid interconnection infrastructure. The speculative nature of the site and lack of underutilization corroboration introduce uncertainty, highlighting the need for further assessment to determine the site's suitability for such a project. With proper validation, this site could offer a compelling opportunity for a small-scale data center or energy storage facility, leveraging the existing industrial infrastructure and grid connectivity.

Location

Coordinates
34.06320, -101.32725
Archetype
Warehouse / Logistics
Confidence tier
Speculative
Estimated load
27.9 MW