Texas Instruments
6412 South Highway 75 Sherman
Signal profile
- Power60% of score10025.4 MW est.Footprint × archetype W/m²
- Grid proximity25% of score970.1 mi to substationHIFLD / SeerAI substations 2025
- Voltage class15% of score70138 kV nearestHIFLD transmission
- Footprint100156.7 acresOSM building footprint
- Underutilization82WARN-corroboratedTX WARN layoff notices
- Data confidence100100% fields · enrichedField coverage
Axes marked “% of score” are the weighted components of the headline composite (95). The rest are corroborating context.
Intelligence
The Texas Instruments site is a strong candidate for a small data center or container-BESS deployment due to its underutilization and proximity to a high-voltage substation. The key risk is the potential for variable load profiles and limited visibility into the site's existing electrical infrastructure. Further assessment is needed to confirm the site's suitability.
The Texas Instruments site is a warehouse and logistics facility with a probable underutilization of its existing power infrastructure, making it an attractive candidate for a small data center or container-BESS deployment. With an estimated load of 25.37 MW and a nearby 138 kV substation just 0.13 miles away, the site has a strong potential for efficient and reliable power supply. However, the variable load profiles and limited visibility into the site's existing electrical infrastructure pose a key risk that needs to be addressed through further assessment and due diligence. The site's underutilization has been corroborated by at least one source, increasing confidence in its potential for repurposing. Overall, the Texas Instruments site offers a compelling opportunity for a container-BESS or edge-DC deployment, but requires careful evaluation and planning to mitigate potential risks.
Underutilization signals
- Texas Instruments - Sherman · Sherman, Grayson County, TX19 layoffs · 2025-12-12T00:00:00.000