Lake Tawakoni Water Treatment Plant
Signal profile
- Power60% of score10020.4 MW est.Footprint × archetype W/m²
- Grid proximity25% of score940.3 mi to substationHIFLD / SeerAI substations 2025
- Voltage class15% of score70138 kV nearestHIFLD transmission
- Footprint100125.7 acresOSM building footprint
- Underutilization35Estimate onlyTX WARN layoff notices
- Data confidence100100% fields · enrichedField coverage
Axes marked “% of score” are the weighted components of the headline composite (94). The rest are corroborating context.
Intelligence
The Lake Tawakoni Water Treatment Plant is a strong candidate for a small data center or container-BESS deployment due to its proximity to a 138kV substation and relatively low estimated load. However, the key risk lies in the speculative nature of the site and lack of underutilization corroboration. Further investigation is needed to confirm the site's suitability.
The Lake Tawakoni Water Treatment Plant is a logistics and warehouse facility with a relatively low estimated load of 20.35 MW, suggesting potential for additional power-intensive uses such as a small data center or container-BESS deployment. The site's proximity to a 138kV substation, just 0.31 miles away, makes it an attractive location for such deployments given the existing high-voltage transmission infrastructure. However, the speculative nature of the site and lack of corroboration on underutilization introduce uncertainty, highlighting the need for further investigation to determine the site's suitability for such projects.