Brasada Gas Plant
513 Chochina Ranch Road Cotulla
Signal profile
- Power60% of score10024.7 MW est.Footprint × archetype W/m²
- Grid proximity25% of score960.2 mi to substationHIFLD / SeerAI substations 2025
- Voltage class15% of score70138 kV nearestHIFLD transmission
- Footprint100152.6 acresOSM building footprint
- Underutilization35Estimate onlyTX WARN layoff notices
- Data confidence100100% fields · enrichedField coverage
Axes marked “% of score” are the weighted components of the headline composite (95). The rest are corroborating context.
Intelligence
The Brasada Gas Plant is a strong candidate for a small data center or container-BESS deployment due to its proximity to a high-voltage substation and underutilized industrial space. However, the key risk lies in the speculative nature of the site and lack of underutilization corroboration. Further site assessment is necessary to confirm its viability.
The Brasada Gas Plant, categorized as a warehouse_logistics facility, presents an opportunity for repurposing its underutilized space for edge data center or container-BESS applications. With an estimated load of 24.699407799417422 MW and proximity to a 138 kV substation just 0.19 miles away, the site benefits from existing high-capacity electrical infrastructure. The speculative tier classification and absence of underutilization corroboration, however, introduce uncertainty regarding the site's current operational status and potential for immediate redevelopment, necessitating further investigation to determine its suitability for such deployments.